Manhyia Palace

Otumfuo Orders Summoning of Chiefs in Owabi and Barekese over Encroachment Concerns

The Occupant of the Golden Stool, Otumfuo Osei Tutu II, has ordered the immediate summoning of traditional rulers in the Owabi and Barekese jurisdictions to answer for widespread encroachment threatening Kumasi’s primary water sources.

Presiding over a sitting of the Ashanti Regional House of Chiefs on November 27, 2026, Otumfuo directed the House’s Stool Lands Committee to urgently schedule a meeting with all chiefs under whose authority the encroachment is taking place, alongside officials from Ghana Water Limited (GWL), the Lands Commission, the Land Use and Spatial Planning Authority (LUSPA), and the Electricity Company of Ghana (ECG).

According to the Asantehene, the meeting will interrogate both the traditional leaders and state officials to identify defaulters complicit in the degradation of the buffer zones. He mandated that the state agencies submit comprehensive reports detailing the current condition of the affected areas.

Following the summons, Otumfuo instructed the Stool Lands Committee to schedule a firsthand inspection of the Owabi and Barekese catchment areas to guide decisive action.

“After the visit, we will announce the demolition of houses in the critical areas, and then we will develop a report and send it to the government to request funding to build walls to protect the critical areas and dredge the silt in the Owabi reservoir,” he stated.

The Asantehene’s directive was triggered by an alarming briefing from the Regional Director of GWL, Dr Hanson Mensah-Akutteh, who warned that human activities have pushed both dams toward collapse.

He revealed that 2,150 acres—representing 52% of the 4,125-acre protected river, forest, and Ramsar wetland area at Owabi—have been encroached upon.

Seven tributaries feeding the Owabie Dam have gone extinct after being blocked with silt for housing construction, while 70% of the reservoir is filled with silt and solid waste. Raw water turbidity has jumped from 15 NTU to 350 NTU, quadrupling water treatment costs after forcing GWL to replace aluminium sulfate with Polymeric Aluminium Chloride (PAC).

Dr Mensah-Akutteh cautioned that the Barekese Dam, which supplies 90% of Kumasi’s water, faces the same fate if urgent steps are not taken. Already, 25% of the 100,000 acres allocated for Barekese has been lost to sand winning and commercial farming, while the Offin River’s recovery volume has dropped from 64 million to 38 million—leaving GWL able to meet only 68% of Asanteman’s water demand.

Story by Hajara Fuseini

Click to read more: https://opemsuo.com/author/hajara-fuseini/

Related Articles

Back to top button