Otumfuo Announces Visit to Owabi, Barekese Dams After Deterioration Report

The King of the Asante Kingdom, Otumfuo Osei Tutu II, has announced plans to visit and inspect the Owabi and Barekese dams following an alarming report detailing severe encroachment and environmental degradation threatening Kumasi’s main water sources.
Presiding over a sitting of the Ashanti Regional House of Chiefs on November 27, 2026, Otumfuo directed the House’s Stool Lands Committee to schedule a firsthand visit to the affected catchment areas to assess the situation and guide decisive action.
“After the visit, we will announce the demolition of houses in the critical areas, and then we will develop a report and send it to the government to request funding to build walls to protect the critical areas and dredge the silt in the Owabe reservoir,” the Asantehene stated.
Before the inspection, Otumfuo instructed that the Stool Lands Committee immediately convene a meeting with traditional rulers under whose jurisdictions the encroachment is occurring, alongside officials from Ghana Water Limited (GWL), the Lands Commission, the Land Use and Spatial Planning Authority (LUSPA), and the Electricity Company of Ghana (ECG).
The meeting will question all concerned Nananom and state officials to identify defaulters, with agencies required to present comprehensive reports on the state of the buffer zones.
The Asantehene’s directive came in response to a grim presentation by the Regional Director of GWL, Dr Hanson Mensah-Akutteh, who warned that both water bodies face collapse due to unchecked human activities.
According to Dr Mensah-Akutteh, 2,150 acres-representing 52% of the 4,125-acre protected river, forest, and Ramsar wetland area at Owabe-have been lost to encroachment.
Seven tributaries feeding the Owabi Dam have gone extinct after being blocked with silt for housing construction, while 70% of the reservoir is filled with silt and solid waste.
Raw water turbidity has surged from 15 NTU to 350 NTU, quadrupling treatment costs after forcing GWL to switch from aluminium sulfate to Polymeric Aluminium Chloride (PAC).
He warned that the Barekese Dam, which supplies 90% of Kumasi’s water, risks suffering the exact same fate unless urgent action is taken.
Already, 25% of the 100,000 acres allocated for Barekese has been encroached upon by sand winning and commercial farming, while the Offin River’s recovery volume has fallen from 64 million to 38 million-leaving GWL able to meet only 68% of Asanteman’s water demand.
Dr Mensah-Akutteh noted that previous interventions-including tree planting, perimeter walls, and intermittent military patrols-failed after encroachers destroyed seedlings and pulled down walls.
Story by Hajara Fuseini
Click to read more: https://opemsuo.com/author/hajara-fuseini/






